Angolan pre-project for purpose-built FPSO
|
Customer: |
Total S.A., France |
COMMISSION
Concept design in Pre-Project phase for hull part including:
- Definition of hull parameters (several versions)
- General Arrangement (several versions)
- Studies on different tank arrangements
- Studies on different pumping arrangements
- Basic structural studies
- PID’s for different versions
- Economical studies
- Contracting Strategy