FPSO Conversion Project 'AOKA MIZU'
Deck payload: 8000t
Client / Owner
Bluewater Energy Services B.V.
Builder
Sembawang Shipyard Pte Ltd.
Description
- Main particulars after conversion:
Length over all: 248,120m
Beam over all: 46.715m
Depth moulded: 21.2m
Draft design + scantling: 14.9 m
Max. displacement at summer draft: 124,477 mt
Deck area: 7985m2
Top side area: 6000m2
Deck payload: 8000t
Accommodation for 84 persons.
-
Classification:
DNV Offshore rules, Flag state (SINA) / IMO, UK Statutory, NORSOK
Contents of our commission
- Basic engineering inclusive Class approval of
the Hull part including:
Structural design inclusive strength- and FEM calculations
Accommodation and deck outfitting
P&ID´s of marine and utility systems
Electrical & Instrumentation
Procurement activities of main equipment - Pre-coordination design:
TRIBON 3D model of the aft machinery spaces and forward utility areas inclusive all piping down to pipe size 2 1/2”, ventilation ducting, cable trays and steel outfitting issues like stairs, ladders etc. - Detailed engineering:
Cable routing (Topside excluded)