SAKHALIN II

Lunskoye Platform (LUN-A) / Piltun Platform (PA-B)

SAKHALIN II

Pictures from the SEIC web site

Located 15km off the north eastern coast of Sakhalin Island, in a water depth of 48 metres, LUN-A is a drilling and production platform with minimum processing facilities. Oil/condensate and gas separation including gas treatment for transport to the LNG plant will be done onshore at the onshore processing facility.
  • Gas approximately 1,800 MM scf/d
  • Peak liquids and condensate about 34,000 b/d
  • Peak oil 16,000 b/d

The Piltun-Astokhskoye-B (PA-B) is a drilling, processing and production platform that will extract oil and associated gas from the Piltun reservoir. The platform will be located in a water depth of 32 meters.
  • Oil approximately 70,000 b/d
  • Associated gas 100 MMscf/d
 

Contents of our commission

  • Deltamarin's scope of FEED phase work:
    Participating in piping engineering of main mechanical outfitting (MMO)
    Participating in structural engineering of MMO
    Strength analysis (specifying calculation targets, methods and tools, schedule and necessary resources)
    Strength calculations
  • Deltamarin's scope of workshop engineering:
    Coordination of MMO engineering
    Engineering schedule follow-up
    Coordination of fabrication engineering (method statements, schedule & follow-up, site assistance)
    Ice shield engineering
    Site assistance in Astrakhan and Nahodka
  • Deltamarin's engineers under RR Offshore's organisation participating in the following:
    Engineering management
    Structural lead
    Caisson system lead
    Ice shield lead
    Preparing the job cards for production
    Material flow control