SAKHALIN II
Lunskoye Platform (LUN-A) / Piltun Platform (PA-B)
Located 15km off the north eastern coast of Sakhalin Island, in a water
depth of 48 metres, LUN-A is a drilling and production platform with
minimum processing facilities. Oil/condensate and gas separation
including gas treatment for transport to the LNG plant will be done
onshore at the onshore processing facility.
| The Piltun-Astokhskoye-B (PA-B) is a drilling, processing and
production platform that will extract oil and associated gas from the
Piltun reservoir. The platform will be located in a water depth of 32
meters.
| Â |
Contents of our commission
- Deltamarin's scope of FEED phase work:
Participating in piping engineering of main mechanical outfitting (MMO)
Participating in structural engineering of MMO
Strength analysis (specifying calculation targets, methods and tools, schedule and necessary resources)
Strength calculations - Deltamarin's scope of workshop engineering:
Coordination of MMO engineering
Engineering schedule follow-up
Coordination of fabrication engineering (method statements, schedule & follow-up, site assistance)
Ice shield engineering
Site assistance in Astrakhan and Nahodka - Deltamarin's engineers under RR Offshore's organisation participating in the following:
Engineering management
Structural lead
Caisson system lead
Ice shield lead
Preparing the job cards for production
Material flow control