Commission:

PJ Banff FPSO suffered a multiple mooring line break in a severe North Sea storm in 2011. The objective was to provide the customer technical support during the reinstallment project including strengthening concept development, basic design and work execution at yard.

  • Design the strengthening of the mooring system foundations in turret and vessel hull for upgraded mooring lines.
  • Strength and fatigue analyses including design loads development and development of fatigue tanalysis procedure.
  • Naval architectural design necessary for the reinstallment project.
  • Technical support during work execution at yard.

 Customer Benefits:

  • Technical support in a demanding fast track reinstallment project.
  • Successful completion of the reinstallment project.